2 overview of the connection area, 1 view from below, Overview of the connection area – SMA STP 5000TL User Manual
Page 24: View from below

6.2 Overview of the Connection Area
6.2.1 View from Below
Figure 6: Connection areas and enclosure openings at the bottom of the inverter
Position
Designation
A
Positive DC connectors, input A for positive DC cables
B
Positive DC connectors, input B for positive DC cables
C
Pin connector for the ESS
D
Pin connector with filler plug for the network connection
E
Cable gland M25 with filler plug for the data cables
F
Enclosure opening for the AC cable
G
Negative DC connectors, input A for negative DC cables
H
Negative DC connectors, input B for negative DC cables
6 Electrical Connection
SMA Solar Technology AG
Operating Manual
STP5-10TL-20-BE-en-13
24
This manual is related to the following products: