3. To deactivate the communication via Bluetooth,

set the rotary switch C to the position 0 using a
flat-blade screwdriver (blade width: 2.5 mm).
This will protect your PV system from
unauthorized access.

☑ The inverter will adopt the setting after commissioning. This can take up to five minutes.

7.4 Commissioning the Inverter

Requirements:

☐ The inverter must be correctly mounted.
☐ The circuit breaker must be correctly rated.
☐ All cables must be correctly connected.
☐ Unused DC inputs must be sealed using the corresponding DC connectors and sealing plugs.
☐ The country data set must be set correctly for the country or the purpose.

Procedure:

1. Mount the enclosure lid:

• Attach one conical spring washer to each

screw. The grooved side of the conical
spring washer must point to the screw head.

• Tighten the screws of the enclosure lid diagonally to each other using an Allen key (AF 5)

(torque: 6 Nm ± 0.5 Nm).

☑ The teeth of the conical spring washers are pushed into the enclosure lid. This

ensures that the enclosure lid is grounded.

2. Secure the protective cover using two screws and an Allen key (AF 5).
3. Securely plug in the ESS.