Inspecting the switch, Installing slide rails and cage nuts to the rack, Installing slide rails – H3C Technologies H3C S7500E Series Switches User Manual
Page 19

8
Inspecting the switch
Follow these steps before installing an H3C S7500E switch:
•
Make sure you have read the chapter "
" carefully and the installation site
meets all the requirements.
•
Make sure a 19-inch rack is ready for use. For how to install a rack, see the rack installation guide.
•
Make sure the rack is sturdy and securely grounded; the installation position on the rack is
appropriate for the chassis; no debris exists inside or around the rack.
•
Make sure the switch is ready for installation and has been carried to a place near the rack and
convenient for moving.
IMPORTANT:
To ensure the stability of the rack, mount the switch at the lowest possible position. To mount multiple
switches on the rack, mount the heaviest switch at the bottom of the rack.
Installing slide rails and cage nuts to the rack
Installing slide rails
Before installing the switch to the rack, install slide rails to the rack. If the rack has slide rails, skip this
section.
Before installing the slide rails, verify that the slide rails can support the weight of the switch. For the
weights of the S7500E series, see "Appendix A Hardware specifications."
For the slide rails, H3C recommends that you order the H3C Slide Rail Accessories,500mm-800mm
(LSTM2KSGD0).
Position the chassis of the S7500E series according to their heights. For the specifications of the S7500E
series, see "Appendix A Hardware specifications."
The installation of slide rails might vary with different types of racks. The following installation procedure
is for your reference only.
To install a slide rail:
1.
Read the signs on the slide rail (see