How to use the meter display, Test in progress icon, Test duration counter – Seaward Supernova Elite User Manual
Page 43: Primary display, Secondary display
![background image](https://www.manualsdir.com/files/804202/content/doc043.png)
How to use the Meter Display
33
IEC Lead
Test in Progress Icon
Indicates test in progress with voltage warning.
Low
Voltage
High
Voltage
Applying
Power
Test Duration Counter
Indicates duration of test. This will count down, when the counter
reaches zero if the Tester is still taking a measurement the counter
will flash.
Primary Display
Indicates test result or pass/fail limit.
Secondary Display
Indicates test output e.g. voltage or current.
How to use the Meter Display
This manual is related to the following products: