Wall-mount - studded or masonry wall, Pole-mount – Gasboy Fuel Point Reader User Manual
Page 28

GASBOY Fuel Point System
4-2
03/28/03
WALL-MOUNT - STUDDED OR MASONRY WALL
1.
There is a nylon plug and nut included with the FPR. It must seal the un-used machined
conduit hole. When the FPR is mounted to a wall, the hole to seal is on the back of the FPR.
Use the nylon plug and nut, along with an o-ring from the C06790 kit.
2.
Refer to the FPR dimension drawing on the next page.
For a studded wall, use 3/8" diameter lag bolts in the two center holes to attach the FPR to a
wall stud.
For a masonry wall, use 1/4" diameter bolts and wall anchors in the four outer holes to mount
the FPR.
3.
Go to Section 3, System Wiring.
POLE-MOUNT
1.
There is a nylon plug and nut included with the FPR. It must seal the un-used machined
conduit hole. When the FPR is mounted to a pole, the hole to seal is usually on the back of
the FPR. Use the nylon plug and nut, along with an o-ring from the C06790 kit.
2.
Refer to the FPR dimension drawing on the next page. Use 3/8 inch diameter U-Bolts in the
four oval holes to attach the FPR to a 2-inch through 3-inch diameter pole.
3.
Go to Section 3, System Wiring.