Figure 4 – Gasboy Atlas Discharge User Manual
Page 9

MDE-4503 Atlas Discharge and Valve Conduit Retrofit Kit • July 2005
Page 9
Installing the M06228K001 or M06228K002 Kit
Figure 4: Installing Valve Wires
19
Screw the retained union half to the end of the conduit that will fit to the junction box as
shown in
20
Tighten the conduit fittings sufficiently to where final installation only requires minor
adjustment.
21
Ensuring that the o-rings are in place, reinstall the valve/filter manifold using (2) of the
retained 5/16 x 1 inch bolts into the right side meter mounting holes as shown in
. (Do
not tighten.)
22
Install the meter stabilizer bracket (
, item 2) by mounting it to the left side of the back
of the manifold mounting flange as shown in
. Insert (2) of the retained 5/16 x 1 inch
bolts. (Do not tighten.)
- 216S (18 pages)
- Atlas Fuel Systems Site Prep Manual (42 pages)
- Atlas Technician Programming Quick Ref (2 pages)
- ATC M05819K00X Kits (28 pages)
- Atlas Fuel Systems Owner Manual (80 pages)
- Gilbarco Global Pumping Unit Operation Manual (42 pages)
- 26 (7 pages)
- Atlas Valve Replacement Kits (10 pages)
- Atlas Fuel Systems Installation Manual (100 pages)
- 9120K (8 pages)
- 9820K (6 pages)
- Atlas Single Std. Inlet Centering Kit (8 pages)
- 8800 Atlas (1 page)
- 9120K Series Service Manual (40 pages)
- 9800A Atlas (6 pages)
- 9800 Atlas (20 pages)
- 9800 Atlas (14 pages)
- M08400 (6 pages)
- 9100 Series (8 pages)
- 9820K Series Installation (62 pages)
- 9853K (8 pages)
- 9216KTW (36 pages)
- Recommended Spare Atlas (14 pages)
- DEF Atlas (28 pages)
- 9820K Series (12 pages)
- 9800Q (1 page)
- Q Series (3 pages)
- 8753E (2 pages)
- 9152AXTW2 (1 page)
- 8800E (2 pages)
- 8800E (1 page)
- 9820Q Series (1 page)
- Atlas Start-up (230 pages)
- 215A (1 page)
- 9800A (4 pages)
- 9820A (1 page)
- 2600A (3 pages)
- 2600A (12 pages)
- 2600A (2 pages)
- 9800Q Front Load Vapor (2 pages)
- 9800Q Vapor (2 pages)
- 216A (31 pages)
- 215A (2 pages)
- Lamp Kit (2 pages)
- 9120Q Pulser (1 page)