beautypg.com

Figure 7 – Gasboy Atlas Discharge User Manual

Page 12

background image

Installing the M06228K001 or M06228K002 Kit

Page 12

MDE-4503 Atlas Discharge and Valve Conduit Retrofit Kit • July 2005

Figure 7: Flange to Frame Dimension

39

If there is a second meter, repeat steps 31 to 38.

40

If the meter shaft to computer/pulser joint was taped at the beginning of the process, remove
the tape and check the connection.

Reconnecting the Conduit:

41

While referencing

Figure 8

, thread the valve wires through the union half attached to the

junction box and into the box.

42

Tighten the conduit fittings.

43

Reconnect the wiring same as originally wired.

44

Replace the junction box cover and tighten the bolts.

45

Check all bolts and connections. Use start-up procedures as noted in MDE-2531.