2.1 Installation

Personnel

Comtest recommends that all installation activities be conducted by certified central
office (CO) installers.

2.2 Site

Survey

Comtest recommends that a site survey be conducted in advance by experienced
personnel to determine and assign the following:

• equipment

rack

location(s)

• shelf position(s) in the rack
• power distribution panel and fusing
• suitable disconnect device for power feed
• connections to OSS and test head.

2.3 Environmental

The MTAS-192 is designed to be installed in a restricted-access location such as a
Central Office environment or remote hardened enclosures. The MTAS-192 is suitable
for mounting on concrete or other non-combustible surface only. The temperature range
for the MTAS-192 is -40 to +60

2

degrees Celsius.

2.4

Tools and Materials Required

The MTAS-192 is easy to install. The following equipment is required:

• One (1) large Philips-head (star) screwdriver
• One (1) narrow, long blade slot-edge screwdriver
• Tie wraps for forming and securing various cables to equipment and cable racks
• Bolts for securing the MTAS to the equipment rack
• 8-wire CAT5 cable (shielded is recommended) for TAL connections
• 8-wire CAT5 cable (shielded is recommended) for Ethernet and serial

connections


2

To operate in temperatures above this range please contact Comtest Networks