beautypg.com

Comm 9 installation, 7 comm 9 installation – Comtech EF Data MiniMac Installation ManualOperation Manual Operation Manual User Manual

Page 122

background image

Installation

MINIMAC Rack Management System

2–20

Rev. 0

2.4.7

COMM 9 Installation

The COMM 9 Rack is identified as the REMOTE SITE (Figure 2-9). Install the
equipment as follows:

1.

Install the RFT-12000 Terminal as specified in the Installation and Operation
Manual.

Command

Response

Set Remote Address

12

Set Remote Communications Jumpers

RS-485 (2-wire)

Note: The satellite modems and switch should be installed in a rack and
protected from the environment.

2.

Install an SDM-300 Satellite Modem and identify as Primary #1. Set the Remote
Address to 1.

3.

Install an SMS-301 Switch. Set the Remote Address to 11.

4.

Install an SDM-300 Satellite Modem and identify as Backup #1. Set the Remote
Address to 9.

5.

Install an UB-301 Breakout Panel as specified in the Installation and Operation
Manual.

6.

Attach a customer-fabricated “Y” cable to the REMOTE port of the SMS-301
Switch, UB-300 (BOP), and the RFT-12000 Terminal.

UB-3 0 0

SM S -3 0 1

C u sto m e r F a b ric a te d

R F T -1 2 0 0 0
Te rm in a l

R e m o te S ite

R e m o te 2 6 -P in
C ircu la r

E S C 2 5 -P in

R e m o te
9 -P in