Programming – Beisler 1360-4 User Manual
Page 88

D-19
Programming Instructions Automatic Multi-Head Serging Machine 1365-4
Beisler GmbH
D.3
Programming
09 A-M ROLLER STOP WITH PH.
Switching state of photocell 17
01 Enable function
00 Disable function
10 ROLLER WAITING (MANUEL)
Period during which the roller is lowered for manual sewing, secures
sewing piece after end of sewing
12 ROLLER UP -> CLAMP MOVE [0.1]
Time delay after the roller is raised before the cross transport starts
13 CLAMP STOP -> PLUNCH DOWN
Time delay after the cross transport stops before the swing arm
stamp is lowered at the transfer position
14 PLUNCH DOWN -> CLAMP OPEN
Time delay after the swing arm is lowered before the cross transport
stamp is lifted
15 CLAMP OPEN -> RETURN
Time delay after the transport stamp is lifted before the cross trans-
port returns
16 TILL SWINGING IN...
Time delay before the swing arm swings in
17 SWING ARM IN -> FOOT DOWN
Time delay after the sewing piece darkens the photocell before the
pressure foot is lowered (if duration is excessive, the sewing piece
may be pulled out of the contour guide by its own weight)
18 PHOTOCELL -> STAMP OPEN
Time delay after the photocell (13) detects the sewing piece before
the swing arm stamp is lifted
21 STACKER IMPULS DURATION
Duration of the stacker pulse (must be long enough for the roller to
be lifted)
22 A-HEAD THREAD MON. SENS.
Sensitivity of the thread monitor at the A machine (setting depends
on thread that is used)
23 B-HEAD THREAD MON. SENS.
Sensitivity of the thread monitor at the B machine (setting depends
on thread that is used)