Finish the site survey, Mount the cs on the wall – D-Link KX-TDA100 User Manual
Page 176
2.9 Connection of 2.4 GHz Portable Stations
176
Installation Manual
4. Finish the site survey
Refer to "2.9.6 After Site Survey".
a.
Return all DIP switches of each CS to the OFF position, and stop supplying power.
b.
Turn off the PS.
5. Connect the CS and PS to the Hybrid IP-PBX and test the operation
Refer to "2.9.7 Connecting a Cell Station to the Hybrid IP-PBX".
a.
Connect the CSs to the Hybrid IP-PBX.
b.
Register the PSs to the Hybrid IP-PBX.
c.
Walk around the service area while having a conversation using a registered PS. If noise is
frequent or conversations disconnect, relocate the CSs or install an additional CS.
6. Mount the CS on the wall
Refer to "2.9.8 Wall Mounting".
a.
Assuming everything goes as planned, mount the CS on the wall.