beautypg.com

Vortech 2006-2010 6.1L Jeep SRT8 User Manual

Page 45

background image

P/N: 4CK020-010 v6.0, 02/17/2012

©2012 Vortech Engineering, Inc

All Rights Reserved, Intl. Copr. Secured

35

N. Continue running the red 10ga. power wire to

the Power Distribution Center. Locate the pro-

vided fuse holder and cut the center of the

wire loop. Attach one end to the red 10ga.

power wire from FPB. Use the supplied ¼”

yellow ring terminal crimp, solder, and attach

to factory power lug. (See Fig. n) Install the

supplied 40amp fuse into fuse holder after all

connections are complete and cover the wire

with a piece of ¼” plastic split loom. (Refer to

wiring diagram).

O. Run the 1/8” instrument tube vacuum line from

the FPB to the passenger side of the engine.

Locate the supplied 7/64” vacuum hose and

cut off a 2” piece. Slide approx. 1” onto the

1/8” nylon instrument tube.

P. Using the supplied brass fitting, connect the

FPB vacuum line to the line between the MAP

sensor and bypass valve. (See Fig. o, and

Fig. p). Cover with ¼” plastic split loom and

secure with the provided tie wraps. This will

be used for boost reference.

Fig. n

Fig. p

Fig. o