beautypg.com

Vortech 2006-2010 6.1L Jeep SRT8 User Manual

Page 35

background image

P/N: 4CK020-010 v6.0, 02/17/2012

©2012 Vortech Engineering, Inc

All Rights Reserved, Intl. Copr. Secured

25

AD. Enlarge the 1/8” pilot hole to 43/64” stepping

up in gradual increments and taking care not

to crack the lid. Using cutters, carefully

remove the surrounding webbing from the

underside of the lid so the supplied bulkhead

sealing nut can sit flush. See fig ag6.

AE. Insert the bulkhead through the top of the lid

and secure it by installing and tightening the

bottom nut as seen in fig. ag7.

Fig. ag6

Fig. ag7