3.1 Installation and Operation

1.

Do not operate unit if any control, switch, components

or devices have been underwater or subject to water

damage.

2.

Before servicing, allow boiler to cool. Always shut off any

electricity and oil supply to boiler when working on it.

3.

Inspect oil line and connections for leaks.

4.

Verify oil burner nozzle is proper size. Over-firing will

result in early failure of boiler sections, and result in a

potentially dangerous situation.

5.

Never vent boiler into enclosed space. Always vent to

the outside. Never vent to another room or inside a

building.

6.

Verify adequate air supply for complete combustion.

7.

Relief valve automatically lifts open when system

pressure exceeds 30 psi. Before installing relief valve

read manufacturer’s instructions. Pipe relief valve to a

safe location. Check with authorities having jurisdiction.

8.

Consider system total water volume, temperature,

initial fill pressure and arrangement when sizing and

installing expansion tank. Improperly installed and

sized expansion tank may result in frequent lifting of

relief valve or other heating system problems. Follow

expansion tank manufacturer guidelines for installation,

and sizing.

9.

Boiler manufacturer recommends initial fill pressure of

10-12 psi. For higher fill pressures increase expansion

tank’s air charge to match fill pressure.

10.

Purge heating system of air and gases is critical for

proper circulation and quiet performance. Once the air

is purged, for boiler installations using float type vents,

air vents should be closed for normal operation. If air

is heard or noticed by loss of heat, purge system and

open vents for short period of time.

3.2 Prior To Installing The Boiler

• Verify you have selected right size boiler with proper

capacity. AHRI rating of boiler selected should be greater

than or equal to calculated peak heating load (heat loss)

for building or area(s) served by boiler and associated

hot water heating systems. Use heat loss calculations

based on approved methods. See Figure 1, Page 8

• Boiler must be supplied with proper oil supply and oil

piping, sufficient fresh combustion air, and suitable

electrical supply.

• Connect boiler to suitable venting and piping systems

adequate to distribute heating load.

• Installation is not complete unless pressure relief valve

is installed 3/4” tapping located in supply piping.

• Thermostat must be properly located and installed
• Failure to pipe boiler correctly may result in excessive

noise or other related problems.

Existing Water System Evaluation
A good system will prevent oxygen contamination of boiler

water.

1.

Causes of oxygen contamination may be:

A. Addition of excessive make up water as a result of

leaks.

B. Absorption through open tanks and fittings.
C. Oxygen permeable materials in the distribution

system.

2.

To insure long product life, oxygen sources must be

eliminated.

Take the following measures:

A. Repair system leaks.
B. Eliminate open tanks from the system.
C. Eliminate and/or repair fittings which allow oxygen

absorption.

D. Use non-permeable materials in the heating system.