beautypg.com

Dunkirk Excelsior EXB Series User Manual

Page 54

background image

54

Steps to inspect, clean and/or replace control well:

1.

Turn off electric service to boiler controls.

2.

Drain boiler water to level below tapping for control

well.

3.

Remove low water cut-off/limit sensor from control

well.

4.

Unscrew control well from tapping.

5.

Inspect portion of control well exposed to water for

scale or sediment buildup.

6.

Light deposits may be removed by wiping control well

with damp cloth. Wiping probe with cloth soaked in

vinegar will remove more tenacious lime deposits.

7.

Clean pipe threads of probe to remove old, hardened

pipe dope and other foreign matter.

8.

Apply moderate amount of good quality pipe dope to

pipe threads on control well, leaving two end threads

bare. Do not use PTFE (Teflon) tape.

9.

Reinstall control well into tapping.

10.

Reinsert low water cutoff/limit sensor in control well

and secure with grommet.

11.

Fill system with water and purge.

12.

Restore electric service to boiler.

13.

Fire burner to heat water in boiler 180°F to drive off

free oxygen.

14.

Warning – before returning boiler to service: Follow

low water cut-off test procedure in Figure 36, Page 41.

18.9 Boiler And System Cleaning Instructions

For Trouble Free Operation

1.

Boiler and system (other than expansion tank) must

be full of water for satisfactory operation. Add water

to system until boiler pressure gauge registers 12 psi.

Water should come out of all air vents when opened.

2.

Wash Oil and grease which accumulate in new hot

water boiler out in following manner:

• Shut off valves have been installed between boiler

return manifold and system, to minimize amount of

system draining.

• Drain boiler to level below relief valve tapping.
• Remove relief valve using extreme care to avoid

damaging it.

• Add appropriate amount of recommended boil out

compound.

• Replace relief valve.
• Fill entire system with water and purge.
• Start firing boiler.
• Circulate water through entire system.
• Vent system, including radiation.
• Allow boiler water to reach operating temperature, if

possible.

• Continue to circulate water for few hours.
• Stop firing boiler.
• Drain system in manner and to location that hot water

can be discharged safely.

• Remove plugs from all available returns and wash

water side of boiler as thoroughly as possible, using

high-pressure water stream.

• Refill system with fresh water.

3.

Add appropriate boiler water treatment compounds

as recommended by your qualified water treatment

company.

4.

Testing pH /alkalinity after boiler and system have

been cleaned and refilled as previously described, test

pH of water in system. Can be done with pH test kit.

pH should be higher than 7 but lower than 11. Add

appropriate water treatment chemicals, if necessary, to

bring pH within specified range. With this lower level of

protection, care must be exercised to eliminate all free

oxygen in system.

5.

Boiler is now ready to be put into service.

18.10 Frequent Water Addition

Frequent water additions, although unusual for water boiler,

are sign of leaky system. Excessive amounts of make up

water supplied to boiler can significantly shorten life of

boiler. Amount of water varies with contamination level of

water. Repair leak and consult with your water treatment

specialist for recommendations.

18.11 Attention To Boiler While Not In Operation

NOTICE

Fully drain boiler if not used during winter months

to prevent freeze damage.

1.

Keep manual fuel supply valve shut off if burner is shut

down for extended period of time.

2.

To recondition heating system in fall season after

prolonged shut down, follow instructions outlined in

See “15 - Filling boiler” on page 38.

3.

Boiler contains controls which may cause boiler to shut

down and not restart without service. If damage due

to frozen pipes is a possibility, heating system should

not be left unattended in cold weather; or appropriate

safeguards and alarms should be installed on heating

system to prevent damage if boiler is inoperative.

4.

Keep boiler and area around it clean. Never burn

refuse or any material other than specified fuel in your

boiler. Have your boiler checked each year by qualified

service agency.

18 - MAINTENANCE