Before initial start-up, Job data required, Equipment required – Carrier 17/19EX User Manual
Page 125: Using the utility vessel and pumpout system

Before Initial Start-Up
Job Data Required
•
list of applicable design temperatures and pressures (product data submittal)
•
machine certified drawings
•
starting equipment details and wiring diagrams
•
diagrams and instructions for special controls or options
•
17/19EX Installation Instructions
•
pumpout unit instructions
Equipment Required
•
mechanic’s tools (refrigeration)
•
digital volt-ohmmeter (DVM)
•
clamp-on ammeter
•
electronic leak detector
•
absolute pressure manometer or wet-bulb vacuum indicator (
•
500 v insulation tester (megohmmeter) for compressor motors with nameplate volt-
age of 600 v or less, or a 5000-v insulation tester for compressor motor rated above
600 v
Using the Utility Vessel and Pumpout System
Pumpout and Refrigerant Transfer Procedures
section for: pumpout system
preparation, refrigerant transfer, and machine evacuation.