beautypg.com

2-2 regular inspection, English – KEYENCE SL-C Series User Manual

Page 49

background image

Chapter 4 Checklist

4

ENGLISH

4. Test Results Confirmation

If the SL-C or the machine to which the SL-C has been installed fails any part of the above test,
operation should be ceased until satisfactory test results are obtained.

A record of the test results must be maintained.

WARNING

If the SL-C does not function as described in the test procedure, do not attempt to
operate the machine to which the SL-C has been installed. Such an operation may
lead to the serious harm, including a serious injury or death of the machine opera-
tor.

4-2-2 Regular Inspection

The responsible personnel must perform a regular inspection at least once every six months.
For the regular inspection, add the following checklist to the checklist given in 4-2-1

“Inspection Prior

to an Operation” (

➮ page 4-3). Note that the checklist below covers the minimum test items required

in using the SL-C Series. It is strongly recommended to add the necessary checking items to this
checklist based on the judgment of the responsible personnel since additional criteria may be
necessary depending on the machine to which the SL-C is installed and the standards and regulations
of the country or region in which it is used.
The result of this inspection must be kept on record along with the machine log.

1. Additional Inspection Items

The distance between the hazardous zone or hazards and the SL-C is greater than the minimum
safety distance calculated.

The stop time of the machine used to determine the minimum safety distance has not increased.

There are no loose screws in the mounting bracket.

There is no light interference due to external light or reflections from glossy surfaces.

The output cable of the SL-C is fastened tightly with no loose screw.

The output from the SL-C is connected correctly to the machine.

The FSD relay must be operating normally if the Intelligent Safety Relay Unit SL-R11(E) is being
used.

There should be no damage that may impair the performance of the protective structure of the SL-
C.

The light receiving surfaces must be free of stains. There should be no scratches on the outer
covers.

Beam axes must be aligned. If the alignment is off, adjust beam axes according to the procedure
described in

3-9 “Beam Axis Adjustment” (

➮ page 3-8) as necessary.

All inspections listed in section 4 “

Post-Installation Itemized Checklist” (

➮ page 4-1) have been

covered.

2. Test Results Confirmation

It the SL-C or the machine to which the SL-C has been installed fails any part of the above test,
operation should be ceased until satisfactory test results are obtained. A record of the test results
must be maintained.

WARNING

If the SL-C does not function as described in the test procedure, do not attempt to
operate the machine to which the SL-C has been installed. Such an operation may
lead to serious harm, including a serious injury or death of the machine operator.

4-5