Waterworks Universal Pop-up Waste and Overflow Drain User Manual
Installation guidelines
±5
5
1
/
2
" min
9" max
22" max
Waterworks
®
Waste and Overflow
These guidelines have been prepared for the professional contractor to aid in the installation of:
WATERWORKS
®
WASTE AND OVERFLOW (FDWO51)
All dimensions are based on original specifications and are subject to change and variation.
Please consult your Design Associate for current specifications.
Installation Guidelines
1
W A T E R W O R K S
®
03/04
FDWO51
INSTALLATION GUIDELINES:
IMPORTANT:
➢ To ensure this product is installed properly, you must read and
follow these guidelines.
➢ The owner/user of this product must keep this information for
future reference.
➢ This product must be installed by a professional contractor and
conform to all applicable codes.
➢ Refer to the specification and assembly drawings attached. This
product is sold partially assembled but shown fully disassembled
for illustrative and service purposes only.
➢ Inspect this product to assure you have all parts required for
proper installation.
➢ Provide an adequate access panel to allow for servicing the
waste and overflow.
➢ When possible, assemble this product to the tub before setting
the tub.
INITIAL ASSEMBLY:
1. Note the maximum and minimum dimensions that this
waste and overflow can accommodate as shown in the
drawings. It is best to dry-fit this waste and overflow and
then cut the waste and overflow pipes as needed before
making final connections.
2. Remove the coupling nuts(4), compression rings(2) and
seals(3) from the tee assembly(1).
3. Slide a coupling nut, compression ring, and seal onto the
overflow pipe. Make sure they are in the correct order or
they will not seal. Repeat this step on the waste pipe.
4. Fit the overflow(16,14) and shoe assembly(5) into the tee
and then hand tighten the coupling nuts. Do NOT over
tighten.
OVERFLOW INSTALLATION:
5. Loosen the swivel ball coupling nut(18) so the overflow
head(16) can be tilted by hand.
6. Place the overflow seal(19) onto the overhead head.
7. Position the overflow body, tee, and shoe onto the tub and
then slide the overflow plate(20) onto the overflow stem
.
8. Adjust the angle of the overflow head to match the angle
of the tub while making sure the overflow seal contacts the
tub wall to form a proper seal.
9. Hand tighten the overflow ferrule(21) onto the overflow
stem to secure the overflow to the tub.
10. Hand tighten the swivel ball coupling nut.
WASTE INSTALLATION:
11. Place the waste gasket(33) and then waste flange(6)into
the tub waste opening. Make sure the waste gasket flange
is positioned as shown so the thicker of the 2 waste gasket
flanges contacts the shoe(5). Depending on the profile of
the drain opening, you may apply clear silicone or putty into
the waste opening of the tub or the optional 3 ¼" gasket
included can be substituted.
12. Position the shoe(5) under the waste opening and then
hand tighten the waste ferrule(7 or 8) into the shoe.
FINAL INSTALLATION AND INSPECTION:
13. Check that the tee and overflow pipe are vertical and that
the waste pipe is horizontal. Adjust as required by
tightening or loosening the coupling nuts.
14. Evenly tighten the waste ferrule(7 or 8) and overflow
ferrule(21) to assure a proper seal. A longer ferrule is
included to accomodate thicker tub waste openings.
04.08
OPTIONAL PLATED 8" TAILPIECE (ZUPWO01)
FDWO51 (drain)
ZUPWO01 (optional plated 8" tailpiece)
➢ Provide an adequate access panel to allow for servicing the
waste and overflow. Product
'
s compression connections may be
field sweat together for a permanent assembly.
➢ When possible, assemble this product to the tub before
setting the tub.
8/09