Waterworks Boulevard One Hole Bidet Fitting with Lever Handles User Manual
Installation guidelines
Boulevard Bidet Fitting
W A T E R W O R K S
These guidelines have been prepared for the professional contractor to aid in the installation of:
BOULEVARD BIDET FITTING (BDBF01)
All dimensions are based on original specifications and are subject to change and variation.
Please consult your Design Associate for current specifications.
Installation Guidelines
1
NOTES
➢ Use only a protected, smooth-jawed, or strap wrench on any finished
surface.
➢ A low-level bidet trap (JUBF 94) for wall rough-in is available.
➢ Rough-in dimensions supplied with bidet.
INSTALLATION
➢ Unscrew the barrel nut at the base of the fitting to release the mounting
plate and gasket. Then, insert the fitting through the mounting hole and
secure by re-attaching and tightening the barrel nut.
➢ Connect the
3
⁄
8
"
O.D. supply tubes to the hot and cold water supply.
INSTALLING THE POP-UP DRAIN (see fig. 1)
➢ Remove the upper collar from the pop-up drain assembly and discard the
upper gasket.
➢ Set the upper collar in the drain opening, using a clear adhesive silicone.
➢ Re-attach the lower drain assembly, using the gasket provided.Tighten
until fully secured and the side connection is facing the wall. A clear
adhesive silicone may be used to ensure a water-tight seal between the
gasket and bidet fixture.
➢ Remove the knurled nut from the side connection of lower drain
assembly. Then, insert the horizontal pivot rod and re-attach the knurled
nut.
➢ Insert vertical lift rod through the bidet body and connect to the
horizontal pivot rod, using the linkage provided (if necessary, the rods may
be field cut).
➢ To adjust the height of the drain stopper, turn the adjustment screw at
the base of the stopper and tighten the locking nut upward to secure.
➢ Attach the flanged tailpiece to the lower drain assembly, using the gasket
provided. Then, connect the tailpiece to the drain line.
➢ Check all connections for leaks.
➢ After installation, unscrew and remove the aerator assembly. Carefully
open the hot and cold valves fully to flush out any debris in the supply
lines. Once the lines have been flushed, close the valves, and reinstall the
aerator assembly.
➢ If further assistance is required, please contact Product Support at:
1-800-927-2120 (8am-7pm EST).
Stopper Assembly
Upper Collar
Upper Gasket
Lower Gasket
Lower Drain Body
Tailpiece Gasket
Tailpiece
Pivot Rod
Knurled Nut
Figure 1
7
1
⁄
2
"
2
5
⁄
8
"
1
7
⁄
8
"
2
1
⁄
4
"
3
7
⁄
8
"
12
1
⁄
2
"
1
3
⁄
4
" max
2
5
⁄
8
"
Note:
•
3
⁄
8
" O.D. compression supply tubes
11/02
BDBF01