Installation guidelines, Fig. 1, Etoile thermostatic shower valve and trim

background image

Etoile Thermostatic Shower Valve And Trim

6/06

W A T E R W O R K S

These guidelines have been prepared for the professional contractor to aid in the installation of:

ETOILE THERMOSTATIC SHOWER VALVE & TRIM ( ETSV26 & GUSV37R)

All dimensions are based on original specifications and are subject to change and variation.

Please consult your Design Associate for current specifications.

Installation Guidelines

1

ETSV26(trim) + GUSV37 (rough)

14

12

11

13 x 2

11a

11b

10

Fig. 1

15

IMPORTANT

1. To ensure this product is installed properly, you must

read and follow these guidelines.

2. The owner/user of the valve must keep this information

for future reference.

3. This valve includes integrated service stops. Make sure

the tile guard is in place.

4. This valve features anti scald protection.The risk of

scalding exists until the installer has properly

calibrated/adjusted the temperature setting during final

trim installation.

5. Valve body rough-in depth is 2 ½" the centerline of the

inlets to the face of the finished wall.

6. Be sure your installation conforms to local codes.

7. This thermostatic valve only mixes hot and cold water and

does not have volume control or shut off capability. A

diverter or wall valves (provided separately) control

on/off/volume and must be installed for each fitting that

will have water flowing to it.

8. This product must be installed by a professional

contractor.

9. Refer to the specification and assembly drawings

attached. Valves are sold partially assembled but

shown fully disassembled for illustrative and service

purposes only.

10. If soldering any connections, remove cartridge to

prevent damage to seals and internal assembly.

11. The trim should be on-site prior to rough in and

allows the installer to visualize the installation.

12. Inspect this product to assure you have all parts

shown that are required for proper installation.

13. Check incoming water pressure; ideal operating

pressure is 50-60 psi. The minimum is 25 psi. and the

maximum is 80 psi.

ROUGH IN:

14 . Make sure the valve body (11, 11a) is positioned

according to valve markings so the inlets are situated

with hot piped on the left and cold piped on the

right. Positioned correctly, notice the inlets are below

an imaginary horizontal line drawn between the 2

cover screws (13).

15. IMPORTANT: Valve rough-in depth is 2-1/2 “mea-

sured from the centerline of the inlets to the surface

of the finished wall.

16. . Run 3/4" copper supply lines to the proper height of

the valve inlets and be sure to secure all piping and

fittings.

17. For each fitting that will have water flowing to it,

install a wall valve or diverter valve (both provided

separately) at the same rough in depth and according

to the flow direction arrow marked on the wall valve

or diverter valve body.

18. The bottom port of the valve body is plugged

(11a),but can be used to supply water to other

fittings.

19. Install the tile guard (10).