Installation guidelines, Fig. 1, Etoile thermostatic shower valve and trim
Etoile Thermostatic Shower Valve And Trim
6/06
W A T E R W O R K S
These guidelines have been prepared for the professional contractor to aid in the installation of:
ETOILE THERMOSTATIC SHOWER VALVE & TRIM ( ETSV26 & GUSV37R)
All dimensions are based on original specifications and are subject to change and variation.
Please consult your Design Associate for current specifications.
Installation Guidelines
1
ETSV26(trim) + GUSV37 (rough)
14
12
11
13 x 2
11a
11b
10
Fig. 1
15
IMPORTANT
1. To ensure this product is installed properly, you must
read and follow these guidelines.
2. The owner/user of the valve must keep this information
for future reference.
3. This valve includes integrated service stops. Make sure
the tile guard is in place.
4. This valve features anti scald protection.The risk of
scalding exists until the installer has properly
calibrated/adjusted the temperature setting during final
trim installation.
5. Valve body rough-in depth is 2 ½" the centerline of the
inlets to the face of the finished wall.
6. Be sure your installation conforms to local codes.
7. This thermostatic valve only mixes hot and cold water and
does not have volume control or shut off capability. A
diverter or wall valves (provided separately) control
on/off/volume and must be installed for each fitting that
will have water flowing to it.
8. This product must be installed by a professional
contractor.
9. Refer to the specification and assembly drawings
attached. Valves are sold partially assembled but
shown fully disassembled for illustrative and service
purposes only.
10. If soldering any connections, remove cartridge to
prevent damage to seals and internal assembly.
11. The trim should be on-site prior to rough in and
allows the installer to visualize the installation.
12. Inspect this product to assure you have all parts
shown that are required for proper installation.
13. Check incoming water pressure; ideal operating
pressure is 50-60 psi. The minimum is 25 psi. and the
maximum is 80 psi.
ROUGH IN:
14 . Make sure the valve body (11, 11a) is positioned
according to valve markings so the inlets are situated
with hot piped on the left and cold piped on the
right. Positioned correctly, notice the inlets are below
an imaginary horizontal line drawn between the 2
cover screws (13).
15. IMPORTANT: Valve rough-in depth is 2-1/2 “mea-
sured from the centerline of the inlets to the surface
of the finished wall.
16. . Run 3/4" copper supply lines to the proper height of
the valve inlets and be sure to secure all piping and
fittings.
17. For each fitting that will have water flowing to it,
install a wall valve or diverter valve (both provided
separately) at the same rough in depth and according
to the flow direction arrow marked on the wall valve
or diverter valve body.
18. The bottom port of the valve body is plugged
(11a),but can be used to supply water to other
fittings.
19. Install the tile guard (10).
Ш5
15
16
"
Ш5
15
16
"
50
6
0
7
0
80
90
1
0
0
1
1
0
120
. .
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
2
1
2
"
4
1
4
"