Installation guidelines – Waterworks .25 Pressure Balance Control Valve Trim with Metal Cross Handle User Manual
Page 2

11. Setting the temperature limit stop screw: Open the
valve to the maximum desired temperature then
turn the limit stop screw (8) in until it seats.
12. WARNING: FAILURE TO ADJUST THE LIMIT
STOP SCREW PROPERLY MAY RESULT IN
SERIOUS SCALDING.
13. WARNING: THIS SHOWER SYSTEM MAY NOT
PROTECT THE USER FROM SCALDING WHEN
THERE IS A FAILURE OF OTHER TEMPERATURE
CONTROLING DEVICES ELSEWHERE IN THE
PLUMBING SYSTEM.
INSTALL THE TRIM:
14. Remove the handle after setting the temperature.
15. Hand tighten the trim connector (31) completely
onto the valve body. This connector MUST be
tightened to prevent damage to the handle.
16. Slide the trim plate (30) over the trim connector
and hold the plate against the wall.
17. Thread the handle/trim adapter (29) onto the trim
connector to secure the plate against the wall. If
desired, a bead of clear silicone can be applied to
the back side of the trim plate.
18 Position the handle with the set screw hole at 6:00
then slide the handle onto the spindle. Secure the
handle to the spindle by tightening the 3mm hex set
screw (27).
19. Open the valve and confirm the temperature
setting, adjust as required.
If further assistance is required, please contact Product
Support at 1-800-927-2120 (8am-7pm EST).
Installation Guidelines
W A T E R W O R K S
Waterworks is a registered trademark of Waterworks Inc.
.25 Pressure Balance Valve Trim
These guidelines have been prepared for the professional contractor to aid in the installation of:
.25 PRESSURE BALANCE VALVE TRIM (PTSV59 & GUSV81R) All dimensions are based on
original specification and are subject to change and variation. Please consult your Design Associate for
current specifications.
04.11.07