4 replacing the power distribution board, 1 removing the power distribution board, Replacing the power distribution board 5.4.1 – Kontron NSW1U IP Network Server User Manual
Page 71: Removing the power distribution board, Figure 54

Kontron IP Network Server NSW1U
December 2009
Product Guide, rev. 1.4
71
Server Component Replacements—NSW1U Network Server
5.4
Replacing the Power Distribution Board
The power distribution board routes power from the power supply to the rest of the server system. It
also contains regulators and DC-to-DC converters to generate several supply voltages from the 12V
that comes from the PSU. Use the following instructions to replace the PDB.
Caution:
Before replacing any of the server components, you must first take the server out of
service, turn off all peripheral devices connected to the system, turn off the system by
pressing the power button, and unplug the power cord from the system or wall outlet.
5.4.1
Removing the Power Distribution Board
1. Power down the server system and unplug all peripheral devices and the power cord(s).
2. Remove the chassis cover. For instructions, see
Section 3.2.1, “Removing the Chassis Cover” on
3. Remove the processor air duct. For instructions, see
Section 3.2.5, “Removing the Processor Air
.
4. Remove the PCI fan assembly. For instructions, see
Section 5.2.3, “Removing the PCI Fan” on
5. Remove the PCI riser card assembly and any add-in card cable connections to the front panel. For
Section 4.4.1, “Removing the PCI Riser Card Assembly” on page 52
6. Unscrew the fastening screws. (“A”)
Figure 54.
Installing the EFP Board
A
B
A
C
AF000897