Step 2), Butt glazed verticals, Fig. 34 – EFCO 904 Series User Manual
Page 35: Fig. 33
![background image](/manuals/636032/35/background.png)
IN HEAD/SILL CAN
THIS HALF OF
MULLION IS SET
MULLION IS SET
IN HEAD/SILL CAN
FACE TAPE
FIRST.
[FIG. 34]
THIS HALF OF
FIRST.
THIS HALF OF
FIRST.
MULLION IS SET
IN HEAD/SILL CAN
FACE TAPE
DPS 7/2001
SECTION IV C - INSTALLATION
#7256
#7256 MULL HALF MUST BE
INSTALLED BEFORE #7255
MULL HALF.
NOTE:
STEP 2)
pertaining to available degree of corner combinations.
(2) 9563 FOR
90 CORNER
(903 & 904)
Below are butt glazed corner mullion halves for each system
APPLY DOUBLE
(2) 7260 FOR
(901 & 902)
135 CORNER
(901 & 902)
CORNER
for 90
#7255
[FIG. 33]
(903 & 904)
135 CORNER
(2) 9562 F0R
APPLY DOUBLE
SILL CAN
#7255
BUTT GLAZED VERTICALS
Refer to the figures below to determine the related parts.
The butt glazed corners are (2) piece and require the first
half of the corner to be installed and then the other half.
PAGE 33
(cont.)