Fig. 27, 2 pc. jamb anchor clip installation [fig. 26, 2 pc. jambs and intermediate verticals – EFCO 904 Series User Manual
Page 31

2 pc. JAMB, TYP.
[FIG. 27]
ANCHOR CLIPS ARE
REQUIRED AT THE
HEAD AND SILL CAN.
ONLY AT PERIMETER
JAMBS.
DPS 7/2001
NOTE:
SILL GLAZING LEG AND ACROSS
TYPE SEALANT AT THE HEAD AND
THE TOP OF THE END DAMS.
APPLY A HEAVY COAT OF BUTYL
AFTER THE JAMB IS IN PLACE,
THE JAMB-HEAD/SILL IN THE
GLAZING POCKET.
THIS STEP IS AT THE JAMBS ONLY.
AFTER THE JAMB IS IN PLACE,
SEAL ACROSS THE JOINT OF
2 pc. JAMB ANCHOR CLIP INSTALLATION
[FIG. 26]
STANDARD HORSESHOE
INSIDE
END DAM
INSIDE
SHIM, TYPICAL.
K434 for S903/S904
K433 for S901/S902
ATTACH THE 2 pc. JAMB
3" FROM TOP AND BOTTOM
AND 24" O.C. MAXIMUM.
TO THE SURROUND
2 pc. JAMBS AND INTERMEDIATE VERTICALS
SECTION IV B - INSTALLATION
will align the head and sill cans as it is installed.
The back member of the (2) pc. jamb and the intermediate vertical
END DAM
(CONT.)
PAGE 29