Step 2) installation of glazing gasket, Fig. #105 – EFCO 403 Series Storefront User Manual
Page 88

EFCO CORPORATION 1/2013 PART NO. Y001
Page 88 of 94
Series 401,402, & 403 Installation Instructions
SECTION V:C. OUTSIDE GLAZING
Step 2) Installation of Glazing Gasket
For inside glazed applications, install the exterior gasket prior to glass installation. For
outside glazed applications, install the interior gasket prior to glass installation.
SIZE THE GASKET LENGTH BY USING THE FOLLOWING FORMULA.
D.L.O. DIM X 1.005 (D.L.O. DIM. + 1/2%)
NOTE: To install glazing gasket, start by pushing the gasket in place at the ends.
Move to the middle, then to quarter points and work the "waves" toward the ends. Do
not stretch the gasket or it will return to its original form, creating gaps at the gasket
intersection. (Gasket length=D.L.O. dim X 1.005. or D.L.O. dim + 1/2%)
See Figure 105 below.
Fig. #105
VERTICAL
JAMB GASKET
RUNS THRU
INSTALL FIRST
SEALANT
SEAL 1" VERTICALLY AND HORIZONTALLY IN THE
GASKET RACES WITH SILICONE TYPE SEALANT AT
ALL CORNERS. SEAL THE ENDS OF HORIZONTAL
GASKETS. CLEAN OFF ANY EXCESS SEALANT.
SEALING RACES AND GASKET ENDS IS REQUIRED AT
THE INTERIOR OF THE SYSTEM. EXTERIOR SEALANT
AT RACE AND GASKET IS OPTIONAL.
8" - 12"
VARIES
TYPICAL
JAMB
SILL
HEAD
VERT. GASKET
RUNS THRU
INSTALL FIRST