Series 401,402, & 403 Installation Instructions
If an entrance is required, install the framing units starting at the
entrance frame and work towards the end of the opening.
Fig. # 70
Fig. # 71
NOTE:
SCREW SPLINE AND SHEAR BLOCK
SYSTEMS INSTALLATION
Apply sealant to the upturned flashing leg cavity as shown in
FRAME MAY BE INSTALLED AS PANEL UNITS.
Locate the first unit into position tight against the flashing back leg.
Be sure the unit is plumb and square.
Shim the jamb and head as required, and then secure them to the
See pages 68 through 70 for anchoring procedures.
Install the remaining panels in a similar fashion, snapping them
SECTION IV: C.
STEP 9)
STEP 10)
together. See Fig. # 70 and # 71 below.
structure.
STEP 8)
STEP 7)
Fig. # 67 on page 65.