Fig. #99, Typical elevation – EFCO 403 Series Storefront User Manual
Page 84

EFCO CORPORATION 1/2013 PART NO. Y001
Page 84 of 94
Series 401,402, & 403 Installation Instructions
TILT LAST VERTICAL INTO
POSITION AGAINST CAN FILLERS
Fig. #99
Tap vertical mullion tight against the can fillers already in place,
TYPICAL ELEVATION
mullions. Check every third mullion for correct spacing.
Install the last can filler of a run before the second to last.
This will allow the tilting of the last vertical mullion into place,
MULLIONS INSTALLED TO HERE
which will then finish the run. See Fig. #99 below.
and then repeat the installation of the next can fillers and vertical
NOTE:
CAN FILLERS HELD UNTIL
LAST VERTICAL INSTALLED
CAN FILLERS & VERT.
CAN FILLERS INSTALLED
CAN SYSTEM
PREPARATION / INSTALLATION
SECTION IV: F.