Weekend start – Outback Power Systems MATE2 User Manual
Page 83

ADV/MATE/AGS/MR----------------
weekday
12:00A
must run stop time
DOWN UP CHANGE
ADV/MATE/AGS/MR-----------------
weekend
12:00A
must run start time
DOWN UP CHANGE
WEEKEND MR START
adj hour
12:00A
DOWN INC DEC
WEEKEND MR START
adj min
12:00A
INC DEC DONE
Weekend Start
Press the
AGS/MR screen to adjust the weekend must run
start time.
weekend must run start time is the beginning
of the time period, Saturday and Sunday, that
the generator will be forced to run. To adjust
the weekend must run start time, press the
Adjust the weekend must run start time hours
using the
Adjust the weekend must run start minutes us-
ing the
AGS/MR weekend must run stop time screen when
finished.