Outback Power Systems MATE2 User Manual
Page 79

ADV/MATE/AGS-----------------------
choose category
QUIET VOLT
SETUP TIME START PG2
ADV/MATE/AGS/PG2----------------
choose category
LOAD MUST
PG1 START RUN PG3
ADV/MATE/AGS/LS------------------
load start 0 kw
DOWN AGS INC DEC
ADV/MATE/AGS/LS------------------
load start 1 min
delay
DOWN UP INC DEC
Go to the ADV/MATE/AGS screen and press the
At the ADV/MATE/AGS/PG2 screen, press the
In the load start kw screen, an AGS start
command will be issued when the total AC load
of all the FXs connected to the MATE exceeds
this setting for the load start delay (next screen)
time. A zero value disables any load start function.
1 – 50kW. After the value has been set, press the
screen.
This setting is the delay time that the total system
AC load must remain above the load start kw
setting (see previous screen), before the generator
is started. It is adjustable from 1 to 240 minutes
using the
making any adjustments to the delay time, press
the
screen.
Load Start KW
Load Start Delay
To open the Load Start screen: