beautypg.com

Carrier EVERGREEN HFC-134A User Manual

Page 52

background image

Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.

Catalog No. 532-309

Printed in U.S.A.

Form 23XRV-1SI

Pg CL-2

309 6-06

Replaces: New

Book

2

Tab

5e

Copyright 2006 Carrier Corporation

-

- -

- -

-

- -

-

- -

-

- -

-

- -

- -

-

- -

-

- -

-

- -

- -

-

- -

-

- -

-

- -

-

- -

- -

-

- -

-

- -

-

- -

-

- -

- -

-

- -

-

- -

-

- -

- -

-

- -

-

- -

-

- -

-

- -

- -

-

- -

-

- -

-

- -

- -

-

- -

-

- -

-

- -

-

- -

- -

-

- -

-

- -

-

- -

-

- -

- -

-

- -

-

- -

-

- -

- -

-

- -

-

- -

-

- -

-

- -

- -

-

- -

-

- -

-

- -

- -

-

- -

-

- -

-

- -

-

- -

- -

-

--

- -

-

- -

- -

-

- -

-

- -

-

- -

- - -

CUT

AL

ONG DO

TT

E

D

LINE

CU

T ALONG DO

TT

E

D

LINE

TESTING

YES/NO

DATE TO BE

COMPLETED

1. The cooling tower fan has been checked for blade pitch and

proper operation.

2. The chilled water and condenser water lines have been:

a. Filled
b. Tested
c. Flushed
d. Vented
e. Strainers cleaned

3. The chilled water and condenser water pumps have been

checked for proper rotation and flow.

4. The following cooling load will be available for start-up:

a. 25%
b. 50%
c. 75%
d. 100%

5. The refrigerant charge is at the machine.
6. Services such as electrical power and control air will be available

at start-up.

7. The electrical and mechanical representatives will be available

to assist in commissioning the machine.

8. The customer’s operators will be available to receive instructions

for proper operation of the chiller after start-up.

Concerns about the installation/request for additional assistance:

I am aware that the start-up time for a Carrier chiller can take between 2 and 6 days depending on the model of the machine and the

options and accessories used with it.

Your contact at the job site will be _______________________________________________________________________________

Phone number ______________________________________________________________________________________________

Cell/Pager number ___________________________________________________________________________________________

Fax number ________________________________________________________________________________________________

In accordance with our contract, we hereby request the services of your technician to render start-up services per contract terms for this

job on

(Date). I understand that the technician’s time will be charged as extra services due to correcting items in this

checklist that are incomplete.

Signature of Purchaser ________________________________________________________________________________________

Signature of Job Site Supervisor ________________________________________________________________________________