beautypg.com

Great Plains V-300F Operator Manual User Manual

Page 61

background image

6/29/2006

148-057M

59

Monitor Operation

20 Bout Tramlining Sequence
For use with a 3 meter drill and a 20 meter sprayer. 2 + 2 left-hand seed spouts are closed on bouts 4 and 17, Asymmetric
right-hand seed spouts closed on bouts 10 and 11. Starting on bout 1 requires turning LEFT at the end of the first bout.

The instrument will beep once at the beginning of each tramline bout and the display will flash for the duration of the tram-
line bout.

3 meter drill

20 meter sprayer

22602