Ultra-cut 100 xt – Tweco 100 Ultra-Cut Plasma Cutting System with Automated Gas Control User Manual
Page 70
ULTRA-CUT 100 XT
3-��
INSTALLATION
Manual 0-5303
2. After the complete system has been installed, check that the coolant has been pumped through the system
as follows (see NOTE):
NOTE
Depending on the length of the torch leads, the system may require more coolant after turning the system
ON for the first time.
a. Place the ON/OFF Switch to ON.
b. After about 4 minutes the system may shut down if the leads are not full of coolant.
c. Place the ON/OFF switch to OFF. Add more coolant if needed
d. After 10 seconds place the ON/OFF switch to ON again.
e. Repeat steps ‘b’ through ‘d’ until the system no longer shuts down. Depending on the length of the torch
leads this sequence may need to be repeated.
f. After the system stays operational allow the pump to operate for ten minutes to properly purge any air
from the coolant lines before using the system.
3. Refill the reservoir and reinstall the filler cap.
4. Purge coolant from the torch before firing the torch. Ensure there are no leaks before use. If leaks are
evident, consult the coolant leak troubleshooting guide in the maintenance section of this manual.