2 - installing the controller, Agency certifications, Compliance to european union directives – Rockwell Automation 1758-RTU202 DataSite Hardware User Manual User Manual
Page 11: Emc directive, Installation considerations, Chapter 2, Installing the controller, Chapter

11
Publication 1758-UM001D-EN-P - June 2011
Chapter
2
Installing the Controller
This chapter shows you how to install the DataSite controller. The only tool
you require is a Phillips head screwdriver.
Agency Certifications
• UL Listed Industrial Control Equipment for use in Class I, Division 2,
Hazardous Locations, Groups A, B, C, D
• cULus Listed Industrial Control Equipment for use in Canada
• CE marked for all applicable directives
• C-Tick marked for all applicable acts
Compliance to European
Union Directives
This product has the CE mark and is approved for installation within the
European Union and EMEA regions. It has been designed and tested to meet
the following directives.
EMC Directive
This product is tested to meet Council Directive 89/336/EEC
Electromagnetic Compatibility (EMC) and the following standards, in whole
or in part, documented in a technical construction file:
• EN 61000-6-4EMC - Part 6-4: Generic Standards - Emission Standard
for Industrial Environments
• EN 61000-6-2EMC - Part 6-2: Generic Standards - Immunity for
Industrial Environments
This product is intended for use in an industrial environment.
Installation Considerations
Most applications require installation in an industrial enclosure (Pollution
Degree 2
(1)
) to reduce the effects of electrical interference (Over Voltage
Category II
(2)
) and environmental exposure.
(1)
Pollution Degree 2 is an environment where, normally, only non-conductive pollution occurs except that
occasionally a temporary conductivity caused by condensation shall be expected.
(2)
Over Voltage Category II is the load level section of the electrical distribution system. At this level transient
voltages are controlled and do not exceed the impulse voltage capability of the product’s insulation.