beautypg.com

Ni signal acquisition box mounting – MTS Criterion 40 - Manual User Manual

Page 80

background image

MTS Criterion

®

Series 40 Product Manual

80

Installing Cables

Installation

NI Signal Acquisition

Box Mounting

The Model C45.504W frame can test with multiple load cells and multiple
channels. If this configuration is desired, an NI Signal Acquisition Box is
required. The typical mounting procedure follows.

1. Twist down all fasteners with the Allen wrench and remove the connector

cover from the base of the load frame.

Allen Screw

M4x8

Connector Cover

Criterion_product manual.book Page 80 Monday, July 28, 2014 3:52 PM