Installing cables, Installing cables 70, Controller connectors j1 usb – MTS Criterion 40 - Manual User Manual
Page 70
MTS Criterion
®
Series 40 Product Manual
70
Installing Cables
Installation
Installing Cables
Exercise care when connecting cables. Ensure that you are using the correct
cables and that all connections are secure. When you are finished, double-check
to ensure that all components are connected properly.
To maintain EMC compliance and help ensure optimal performance, MTS
recommends ordering all system cables from MTS. Cables should be installed so
that they are protected from conditions that could damage the cable.
There is dangerous voltage inside the machine.
Connecting cables with power applied can cause damage to the equipment.
Ensure that the power is turned off before connecting cables.
Controller connectors
J1 USB
This is a standard USB 2.0 connector that accepts a USB-B cable connector and
connects to the computer. This provides a communications interface between the
testing software on the PC and the controller. This is used to allow the software to
change settings in the controller and to receive data from the controller.
CAUTION
J1 USB
J2 Handset
J3 Interlock
J4 Encoder
J5 Digital I/O
J7 Monitor1
J6 Monitor2
J9 DC Cond
J8 DC Cond
Power OK Fault
J10 Aux Pw1
J11 Guard
J12 Digital I/O
Insight
J13 Digital I/O
User
J14 E-Stop
Criterion_product manual.book Page 70 Monday, July 28, 2014 3:52 PM