beautypg.com

Bryant 312AAV User Manual

Page 29

background image

CHECKLIST—INSTALLATION

LOAD CALCULATION

____________

Heating Load (Btuh)

____________

Cooling Load (Btuh)

____________

Furnace Model Selection

AIR FOR COMBUSTION AND VENTILATION

____________

Unconfined Space

____________

Confined Space

VENTING

____________

NFGC (United States)

____________

NSCNGPIC (Canada)

____________

Local Codes

____________

1/4-in. Upward Slope

____________

Joints Secure

____________

See Attached Vent Table Instructions

CHECKLIST—START-UP

____________

Gas Input Rate

(Set Within 2 percent of Rating Plate)

____________

Temperature Rise Adjusted

____________

Thermostat Anticipator Setting Adjusted or

____________

Thermostat Cycle Rate (3 cycles per Hr)

CHECK SAFETY CONTROLS OPERATION

____________

Primary Limit

____________

Pressure Switches

____________

Draft Safeguard Switch

—29—