beautypg.com

Test sequence -18 subtests -18, Test sequence, Subtests – Toshiba Portege 7140 User Manual

Page 136

background image

9-18 Troubleshooting

User's Manual

Portege 7140CT User's Manual – 7140_UK.doc – ENGLISH – Printed on 20/12/99 as IM_714UK

Test sequence

The diagnostic test checks the computer and attached peripherals in the

following sequence:

1.

System test

2.

Memory test

3.

Display tests

4.

Floppy Disk (Diskette) test

5.

Hard disk test

6.

Printer test

When a test is in progress, the program displays:

IN PROGRESS TSSDSS

where T indicates the test number, the first SS indicates the subtest

number, D indicates the drive (if tested), and the second SS indicates the

hardware status.

Subtests

The following gives details on each subtest:

System/memory

The System and Memory tests run together for about one minute. The

System test displays no messages. The Memory test displays the

following message:

MEMORY TEST IN PROGRESS XXXXXX

where xxxxxx is the current memory location being tested. The memory

test includes conventional and extended memory.
If either test aborts:

1.

Write down everything that appears on screen.

2.

Press Ctrl + Pause (Break) or Ctrl + C to return to the diagnostics

menu.

3.

Consult your dealer.

This manual is related to the following products: