82
9. Install the slot cover by positioning it over the slot opening and
tightening the two captive screws.
Figure 44. Installing the Slot Cover
10. Remove the switch from the equipment rack.
11. Go to the next procedure.
Configuring the
New Master
Switch
With the master switch removed from the equipment rack, you are ready
to install and configure the new master switch. This stage includes
configuring the stack ID number and downloading the configuration file.
These steps should be performed before the switch is connected to the
stack.
To configure the new master switch, perform the following procedure:
1. Install the AT-StackXG Stacking Module in the new master switch. For
instructions, refer to “Installing the AT-StackXG Stacking Module” on
page 39.
2. Install the switch in the equipment rack. For instructions, refer to
“Installing the Switches in an Equipment Rack” on page 44.
3. Power on the switch by connecting the power cord to the back of the
switch and to a power source.