Chapter 2, Installing the hardware – Allied Telesis AT-9448Ts/XP (Basic Layer 3) User Manual
Page 31
31
Chapter 2
Installing the Hardware
This chapter contains an overview of the installation procedures for a stack
and the procedures for installing the hardware. The chapter contains the
following sections:
“Installation Overview” on page 32
“Reviewing the Safety Precautions” on page 34
“Planning the Installation of a Stack” on page 36
“Maximum Number of Switches in a Stack” on page 37
“Unpacking a Switch” on page 38
“Installing the AT-StackXG Stacking Module” on page 39
“Installing the Power Cord Retaining Clip (AC Switches Only)” on
page 42
“Disconnecting the Network Cables” on page 43
“Installing the Switches in an Equipment Rack” on page 44
This manual is related to the following products: