Installation overview – Allied Telesis AT-9448Ts/XP (Basic Layer 3) User Manual
Page 32

Chapter 2: Installing the Hardware
32
Installation Overview
Table 7 lists the installation procedures for a stack of the AT-9424Ts,
AT-9424Ts/XP, and AT-9448Ts/XP Switches. The procedures, which are
divided into four chapters, should be performed in the order presented in
the table. Allied Telesis recommends that you print this table and place a
check mark beside the procedures as you complete them.
Table 7. Installation Procedures
Step
Procedure
Chapter 2, “Installing the Hardware”
1
Refer to “Reviewing the Safety Precautions” on
page 34
2
Refer to “Planning the Installation of a Stack” on
page 36
3
Refer to “Maximum Number of Switches in a
Stack” on page 37
4
Refer to “Unpacking a Switch” on page 38
5
Refer to “Installing the AT-StackXG Stacking
Module” on page 39
6
Refer to “Installing the Power Cord Retaining Clip
(AC Switches Only)” on page 42
7
Refer to “Disconnecting the Network Cables” on
page 43
8
Refer to “Installing the Switches in an Equipment
Rack” on page 44
9
Refer to “Labeling the Switches” on page 46
Chapter 3, “Preparing the Switches”
10
Refer to “Powering on a Switch” on page 48
11
Refer to “Starting a Local Management Session”
on page 50
12
Refer to “Verifying the AT-S63 Version Number”
on page 52
13
Refer to “Updating the AT-S63 Management
Software” on page 53
14
Refer to “Assigning the Static Module ID Number
1 to the Master Switch” on page 54