Chapter 3, Preparing the switches, Chapter 3, “preparing the switches – Allied Telesis AT-9448Ts/XP (Basic Layer 3) User Manual
Page 47
47
Chapter 3
Preparing the Switches
The chapter contains the following procedures:
“Powering on a Switch” on page 48
“Starting a Local Management Session” on page 50
“Verifying the AT-S63 Version Number” on page 52
“Updating the AT-S63 Management Software” on page 53
“Assigning the Static Module ID Number 1 to the Master Switch” on
page 54
“Assigning Static Module ID Numbers to the Member Switches” on
page 57
Note
The cables should not be connected to the AT-StackXG Modules
during the procedures in this chapter.
This manual is related to the following products: