beautypg.com

Chapter 3: installing the hardware 96 – Allied Telesis x610 Series Layer 3 User Manual

Page 96

background image

RPS

READ

Y

STACKI

NG

risk of
rvicing

AT-LX44CPUCV

R

AT-x6EM/X

S2

1

2

L/A

L/A

POWER

SFP+

SFP+

CLASS 1

LASER P

RODUCT

10G LINK

ACT

L/A

Chapter 3: Installing the Hardware

96

Figure 68. Connecting a Fiber Optic Cable to the SFP+ Transceiver

8. Connect the other end of the stacking cable to a Stack Port on the

stacking module in the next switch of the stack. A stacking cable must
crossover and connect to a different port on the next stacking module.
Stack Port 1 on a module must connect to Stack Port 2 on the next
module.

Caution

Do not connect two stack Port 1 ports or stack Port 2 ports together.