beautypg.com

Installing the switches in an equipment rack, Figure 40. removing the feet – Allied Telesis x610 Series Layer 3 User Manual

Page 79

background image

x610 Series Layer 3 Gigabit Ethernet Switches Installation Guide

79

Installing the Switches in an Equipment Rack

Perform the following procedure to install each switch in a standard
19-inch rack:

Note

Steps 1, 2, and 3 are optional. These steps provide instructions on
how to remove the snap-on plastic feet from the bottom of a switch.
You can leave the feet on.

1. Place the switch upside down on a level, secure surface.

2. Using a flat-head screwdriver, remove the snap-on plastic feet from the

bottom of the switch, as shown in Figure 40.

Figure 40. Removing the Feet

3. Turn the switch over.

4. Attach a rack-mount bracket to one side of the switch using six of the

screws that come with the switch and then install the second
rack-mount bracket on the other side of the switch with the six
remaining screws, as shown in Figure 41.