beautypg.com

Allied Telesis x610 Series Layer 3 User Manual

Page 95

background image

RPS

READ

Y

STACKING

risk of
rvicing

AT-LX44CPUCVR

AT-x6EM/X

S2

1

2

L/A

L/A

POWER

SFP+

SFP+

CLASS 1

LASER P

RODUCT

10G LI

NK

ACT

L/A

RPS

READ

Y

STACKING

risk of
rvicing

AT-LX44

CPUCVR

AT-x6EM/X

S2

1

2

L/A

L/A

POWER

SFP+

SFP+

CLASS 1

LASER P

RODUCT

10G L

INK

ACT

L/A

x610 Series Layer 3 Gigabit Ethernet Switches Installation Guide

95

5. Verify that the handle on the SFP+ transceiver is in the upright

position, as shown in Figure 66, to prevent inadvertently removing the
transceiver.

Figure 66. Positioning the SFP+ Transceiver Locking Handle

6. Remove the dust plug from the SFP+ transceiver, as shown in

Figure 67.

Figure 67. Removing the Dust Plug from an SFP+ Transceiver

7. Connect a cable to the SFP+ transceiver, as shown in Figure 68. For

SFP+ optical and cabling specifications, consult the documentation
shipped with the module.