beautypg.com

Chapter 6, Powering on and verifying the stack – Allied Telesis 8100S Series User Manual

Page 91

background image

91

Chapter 6

Powering On and Verifying the Stack

The procedures in this chapter are listed here:

“Powering on AC Switches” on page 92

“Powering On DC Switches” on page 97

“Verifying the Installation” on page 101