beautypg.com

Allied Telesis 8100S Series User Manual

Page 100

background image

Chapter 6: Powering On and Verifying the Stack

100

11. Repeat this procedure to power on the second power supply.

Warning

This unit might have more than one power source. To reduce the
risk of electric shock, disconnect all power cords before servicing the
unit.

 E30

12. Repeat this procedure to power on the other switches in the stack.

At this point, the stack is operational and ready to forward network traffic.
Before connecting the network cables, go to the next procedure, “Verifying
the Installation” on page 101.