beautypg.com

Solar-powered using timer – DAVIS Cellular Telephone Antenna Kit User Manual

Page 5

background image

Typical Installations

Page 5

4. Install CTM (see “Installing Cellular Telephone Modem” on page 13).

5. Install terminal plate (see “Installing Terminal Plate/Timer” on page 15).

6. Connect AC-power wires (see “Connecting AC-Power Wires” on page 16).

Do not connect to AC power yet.

7. Install hand set and hang-up cups (optional; see “Installing Handset and Hang-Up

Cups” on page 20).

If you wish to originate or receive voice calls at the weather station/CTM
site, you will need to install the handset and hang-up cup assembly.

8. Check wiring.

Before you apply power to the system, review your wiring to make sure all
connections are correct and all wires firmly secured in the proper terminal.

9. Connect power to system.

Do not connect power until the rest of your installation is complete.

Plug the

power adapter into a power outlet.

10. Finalize the installation by testing the installation (see “Finalizing the Installation” on

page 21).

Solar-Powered Using Timer

The illustration below shows a solar-powered station and CTM using a Timer
for power conservation.

You must complete the following steps for this installation.

Cell Phone
Handset

Regulator

In-Line
Fuses

Battery

Console

Sensor

Interface

Module

Terminal
Block

CTM Power

Cable

Radio Surge Protector (optional)

To Antenna

Protector Ground

CTM

Timer

Link Adapter