Finalizing the Installation

Page 21

Installing the Hang-Up Cups on Wood Wall (of Shed or Similar Structure)
Use #6 x

¾

" wood screws to secure the cup assembly in place, as shown

below.

F

INALIZING

THE

I

NSTALLATION

The sections below detail the final steps that must be taken to complete the
installation.

Test Cell Phone

To insure that the CTM is working properly, test it. If you have a handset place
a call. If you do not have a handset, attempt to call the station using the Weath-
erLink software (try running the Bulletin). Consult the WeatherLink manual
for instructions.

Move Green CTM Power Wire (Solar Power/Battery Installations Only)

Once you are sure the cellular phone/CTM is working, move the green CTM
power wire from terminal 3 (orange) on the terminal block to terminal 2
(green).

Note: If power is completely removed from the CTM, the green CTM wire should be moved back to ter-

minal 3 before power is restored. Once power is restored, move the green wire back to
terminal 2. If this procedure is not followed, the CTM will occasionally power up in a non-
responding state.

#6 x 3/4" Wood Screws

Terminal
Block

1 2 3 4

Power-Conserving
(operating) Position

Power-Up & Test
Position

Green