beautypg.com

3)port tests submenu of 4)test -29 – ADTRAN T1-FT1 User Manual

Page 65

background image

Chapter 3. Operation

61200060L1-1

TSU User Manual

3-29

1.

Follow standard operating procedure to access the

4)TEST

menu item.

2.

With the cursor on

2)RUN SELFTEST

, press

ENTER

.

A changing display in the LCD showing the test outcome

displays.

3.

Press the

CANCEL

key to exit.

3)Port Tests submenu of 4)Test

Port Tests are used to control the activation of a DTE
loopback. This test loops data received at theV.35 interface
back towards the DTE.

1.

With the cursor on main menu item 4)T

EST

,

press

ENTER

. The first two Test submenu items with the cursor

on

1)NETWORK TESTS

displays.

2.

Use the down scroll key to select

3) PORT TESTS.

3.

Press

ENTER

. The loopback setting displays.

4.

Use the scroll keys to select

OFF

or

ON

.

ON

- the DTE Loopback is activated

OFF

- deactivates looping (returns unit back to

normal state)

5.

Press the

CANCEL

key to exit.

S Y S T E M S E L F - T E S T

A L L T E S T S P A S S E D

1 ) D T E L O O P B C K : O F F