beautypg.com

Power up testing and initialization -6, Power up testing and initialization, Self test – ADTRAN T1-FT1 User Manual

Page 36

background image

Chapter 2. Installation

2-6

TSU User Manual

61200060L1-1

POWER UP TESTING AND INITIALIZATION

When shipped from the factory, the TSU is uninitialized and
set to factory default conditions. At the first application of
power, the unit will automatically execute self tests followed
by an initialization sequence which sets up the unit.

Self Test

Upon a power-up or commanded self tests the LCD displays

ADTRAN TSU INITIALIZING

and the LEDs illuminate

sequentially. When the self test is completed with no failures
detected, the LCD will momentarily display

ALL TESTS

PASSED

. If a failure is detected it is displayed in the LCD

window. The automatic self test procedure consists of the
following tests.

1.

Board level tests.

RAM tests; EPROM checksum

On board data path. Sending a known test pattern
through an on board loop.

2.

Unit level tests.

Front Panel LED verification

Phase Lock Loop verify